17.02.09
Aas-Jakobsen AS
designs
new terminal at Oslo airport
Aas-Jakobsen AS is part of the group
that has been awarded the
design contract for the new terminal at Oslo airport. The first phase
involves a preliminary study to be completed the autumn of 2009. The
preliminary study will be the basis for Avinors decision to build.
This decision will be made by Avinor towards the end of 2009.

Narud-Stokke-Wiig |